The recently opened Horseshoe Bridge is one of seven new bridges and a key part of the City of Calgary’s Deerfoot Trail Improvements project, which will address rising traffic volumes and improve travel efficiency along Alberta’s busiest highway.
The project encompasses 10 kilometres (6 miles) of urban freeway and includes major interchange upgrades, expanded vehicle capacity, improved entrances and exits, and modernized infrastructure. Construction has been carefully staged to maintain traffic flow and minimize disruption to travelers.
Stantec, along with construction partner Aecon, the Alberta Ministry of Transportation and Economic Corridors, and other partners, is marking the opening of the Horseshoe Bridge in Calgary. Stantec is the lead designer for the project under a design-build contract led by Aecon.
The Deerfoot Trail Improvements is No. 89 on ReNew Canada’s 2026 Top100 Projects report.
“Deerfoot Trail is a key artery through the heart of Alberta’s economic corridor, so keeping people moving during construction has been critical,” said David Thatcher, vice president of transportation at Stantec. “As one of the province’s most significant infrastructure projects, these improvements will reduce commute times and enhance quality of life for Albertans.”
Craig Carmody, Project Director, Aecon added: “This bridge is proof of what is possible when people work together towards a common goal.”
Featured image: (Aecon)










