The Government of Alberta announced that it has chosen Hatch Ltd. to study the feasibility of a new water reservoir in southeastern Alberta.

Hatch Ltd. will prepare a report on the feasibility of building the Eyremore Dam on the Bow River.

“We are taking a whole-government approach to managing and maintaining provincial water management infrastructure systems to make sure Albertans have access to the water they need when they need it. We are committed to examining whether the Eyremore Dam can be built and operated for a cost that provides true value to Albertans,” said RJ Sigurdson, Minister of Agriculture and Irrigation.

Budget 2023 earmarked $5 million to assess the feasibility of construction of the Eyremore Dam and Reservoir on the Bow River. The project would be potentially located about 43 km downstream of the Bassano Dam, east of Brooks and Lake Newell. Hatch will begin the study immediately. The report is due in spring 2025.

“It is exciting to see this study begin. Right now, we’re limited in our collective ability to manage water effectively and this study will examine how the proposed reservoir can correct that. A new multi-purpose reservoir at this location would revolutionize water management in the South Saskatchewan River Basin,” said Richard Phillips, general manager, Bow River Irrigation District.

Hatch Ltd. is a Canadian multi-disciplinary professional services firm that delivers a comprehensive array of technical and strategic services, including engineering, consulting, information technology, process development, and project and construction management to the energy, mining and metal, and infrastructure sectors.

Featured image: (Alberta Agriculture and Irrigation)

See also  Second tunnel-boring machine breaks through at future Broadway Subway Oak-VGH Station

LEAVE A REPLY

Please enter your comment!
Please enter your name here