
Tunnel boring machine for Montreal’s Blue Line Project begins 4.6km route to Anjou
The beginning of horizontal mass excavation using the tunnel boring machine for the Blue Line extension began, along with the unveiling of the name of

The beginning of horizontal mass excavation using the tunnel boring machine for the Blue Line extension began, along with the unveiling of the name of
