North Shore Wastewater Treatment Plant Program

Province: British Columbia

City/Region: North Vancouver

Image Credit: Metro Vancouver

21

Project Rank

Project Start: 2018

Project End: 2030

Project Type: Water Wastewater

Industry Sector: Other

Project Amount: $3.86 billion

Date of Completion: 2030

Funding Source: P3

Previous Rankings

202521
202359
202166
202068
201968
201868
201764
201666
201568
201497

About The Project

​​​The new North Shore Wastewater Treatment Plant will serve over 300,000 residents and businesses in the Districts of North and West Vancouver, the City of North Vancouver, and Sḵwx̱wú7mesh Úxwumixw (Squamish Nation), and səlilwətaɬ (Tsleil-Waututh Nation). It will replace the existing Lions Gate Wastewater Treatment Plant on the North Shore, one of the last plants on the west coast of Canada and the United States to provide only primary level wastewater treatment. Building a new wastewater treatment plant that provides a higher level of treatment is essential to comply with mandatory federal regulations. It will also ensure the treated wastewater released into the marine environment of the Burrard Inlet is much cleaner.

Project Owner: Metro Vancouver

Engineer: AECOM (Design Consultant)

Contractor: PCL Constructors Westcoast Inc.

Other Key Players: McElhanney (site surveyor); Aon, INTECH (risk advisor); Hanscomb (independent certifier); Golder (WSP) (geotechnical evaluations); Wood (WSP) (consulting and environmental engineer, geotechnical studies/materials tester); WSP (concrete evaluations)

Management Consultants: Program Management Consultant: Stantec (Owner’s Engineer)

Architects: AECOM

Legal: Norton Rose Fulbright (counsel for Metro Vancouver); Borden Ladner Gervais (legal advisor for contractor); Stikeman Elliott LLP

Key Players

Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.