Gordon M. Shrum Generating Station Refurbishment
Province: British Columbia
City/Region: Peace River
Image Credit: BC Hydro
NR
Project Rank
Project End: 2023
Project Type: Hydroelectric
Industry Sector: Energy
Project Amount: $600 million
Date of Completion: 2023
Funding Source: Public
Provincial Funding: BC Hydro: $600 million
MW Generation Power: 2730
Previous Rankings
2022 | 85 |
2021 | 75 |
2020 | 76 |
2019 | 75 |
2018 | 76 |
2017 | 74 |
2016 | 77 |
2015 | 78 |
2014 | 86 |
About The Project
The G.M. Shrum Generating Station, located at the W.A.C. Bennett Dam, provides about 24 per cent of BC Hydro’s hydroelectric power. Currently, there are several capital projects underway at this generating station and dam to replace the station’s 50-year-old equipment. The largest, in terms of budget, was the replacement of five turbines and this project was completed in fall 2015. In 2018, work began to install new exciter transformers on units one through five. The Generators 1-10 Control System Upgrade is well underway with all major contracts awarded and 9 of 10 units completed. Work will be completed on spillway upgrades by early fall 2021 and the spillway gate project by 2022. Also, near the spillway will be the replacement of the reservoir boom. The boom is in design. Fabrication and installation are planned for 2022. Stoplog replacement is at the design for fabrication stage and installation is anticipated in 2023. Finally, 4 out of 10 of the 500 kV disconnect switches have been replaced with a target for full project completion in summer 2022.
Project Owner: BC Hydro
Contractor: Peter Kiewit Infrastructure
Turbine Supplier: Voith Hydro
Other Suppliers: Andritz Hydro (rotor poles), Siemens (replacement transformers); Voith Hydro (turbines); Englobe (turbine QA)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley