Broadway Subway Extension
Province: British Columbia
City/Region: Vancouver
Image Credit: BC Ministry of Transportation and Transit
33
Project Rank
Project End: 2027
Project Type: LRT
Industry Sector: Transit
Project Amount: $2.83 billion
Date of Completion: 2027
Funding Source: Public
Federal Funding: $$896.9 million
Provincial Funding: $1.82 billion
Municipal Funding: City of Vancouver: $99.8 million (in-kind land contribution)
LEED Status: Certified
Road or Transit Length (KM): 5.7
Previous Rankings
| 2025 | 29 |
| 2024 | 29 |
| 2023 | 26 |
| 2022 | 27 |
| 2021 | 24 |
| 2020 | 23 |
| 2019 | 20 |
| 2026 | 33 |
About The Project
The Broadway Subway Project will see the addition of six underground stations and 5.7 kilometres of track to the Millennium Line. The extension will run from VCC-Clark Station to Arbutus Street; 700 metres will be elevated guideway and the remainder will be tunneled. The commute from VCC-Clark to Arbutus Station will take 11 minutes, saving the average transit commuter almost 30 minutes a day and will relieve congestion along Broadway. In 2024, tunnel boring operations finished, marking the completion of the most technically complex and challenging part of the new subway construction.
Project Owner: Province of British Columbia (The Transportation Investment Corporation is leading the delivery of the project on behalf of the Ministry of Transportation and Infrastructure)
P3 Team Members/Project Team: DBF Team: The Broadway Subway Project Corporation – A joint venture of Acciona Infrastructure Canada Inc. and Ghella Canada Ltd.
Other Key Players: Arcadis-IBI Group / DIALOG BC Architecture Engineering Interior Design Planning Inc. / Mott MacDonald Canada Ltd. / Parsons Inc / Norland / BD Hall, Golder (WSP) (geotechnical services); McElhanney (site surveyor); HKA (management consultant); Associated Engineering (quality control); Aon, INTECH (risk advisor); Hanscomb (cost consultant); Stantec (early works); Wood (WSP) (consulting engineer/geotechnical studies); EXP; Hatch; Colliers Project Leaders; GeoVerra (site surveyor); Kontur (geotechnical services); Cartel Communications, Inc.; KPMG; Turner & Townsend (cost consultant)
Legal: Norton Rose Fulbright (owner’s advisor); Gowling WLG
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Gold (15-19 Projects)
Silver (10-14 Projects)
Bronze (5-9 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- Alstom
- Associated Engineering
- Black & McDonald
- Blake, Cassels & Graydon
- Cartel Communication Systems
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- DIALOG
- EBC Inc.
- FlatironDragados
- GeoVerra
- HDR
- Hemmera
- Infrata
- Kasian
- Lakeland Consulting Inc.
- Lavery, de Billy
- LRI Engineering
- McMillan LLP
- Montrose Environmental
- Mott MacDonald
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Parkin Architects Ltd.
- Plenary Americas
- R.V. Anderson
- STRABAG Inc.
- Tiree
- Torys