Muskrat Falls Project
Province: Newfoundland and Labrador
City/Region: Muskrat Falls
Image Credit: Nalcor Energy
NR
Project Rank
Project Type: Hydroelectric
Industry Sector: Energy
Project Amount: $12.7 billion
Date of Completion: Transmission 2018; Generation 2019; Substantial Completion 2020
Funding Source: Public/Private
Federal Funding: $$2.9 billion (loan)
Provincial Funding: $3.35 billion
Private Funding: $6.45 billion
Transmission Line Length (KM): 1600
MW Generation Power: 824
Previous Rankings
| 2021 | 4 |
| 2020 | 4 |
| 2019 | 3 |
| 2018 | 3 |
| 2017 | 3 |
| 2016 | 3 |
| 2015 | 2 |
| 2014 | 12 and 19 (now combined) |
About The Project
Nalcor Energy leads this development, which includes construction of an 824-megawatt hydroelectric generating facility at Muskrat Falls on the lower Churchill River in Labrador and more than 1,600 kilometres of associated transmission lines and infrastructure that will deliver electricity to Newfoundland and Labrador.
The Government of Newfoundland and Labrador sanctioned the Muskrat Falls Project in December 2012, and construction of the project began in January 2013. Construction has started as planned on all major work sites for the project, including Muskrat Falls, Soldiers Pond, Churchill Falls, the Strait of Belle Isle, and the transmission routes.
Once completed, the project will provide sustainable energy production for residential, commercial, and industrial growth throughout Newfoundland and Labrador in the coming decades.
The Muskrat Falls project reached a major milestone in 2020, with first power flow from Muskrat Falls, as the first unit was successfully synchronized with the electricity grid in Labrador. Power was able flow from units 1 and 2 by the end of 2020, with units 3 and 4 coming online in 2021.
Financing Detail: Project funding is derived from (a) $5 billion in Government of Canada guaranteed, long-term bonds issued in the public debt markets in December 2013; (b) equity contributions from the Government of Newfoundland & Labrador; and (c) equity contributions from Emera relating to their partnership interest in the Labrador–Island Link. In December 2012, the projects were sanctioned with the direct facilities capital cost of $6.2 billion plus financing costs to be capitalized during the period up to their in-service date. In June 2016, the direct facilities capital cost for the projects was updated. External market pressures, combined with strategic investments to enhance system reliability, operation, and productivity throughout construction, resulted in a cost forecast of $9.1 billion.
Project Owner: Nalcor Energy; Emera (Labrador-Island Transmission Link)
Engineer: Nalcor Energy; SNC-Lavalin; Wood Group (consulting)
Contractor: Generation: Andritz Hydro Canada; Astaldi Canada; Barnard-Pennecon JV Transmission: GE Energy (formerly Alstom Grid Canada and Alstom Renewable Power Canada); Andritz Hydro Canada; H.J. O'Connell Construction; Valard Construction; Pomerleau
Other Key Players: IKC-ONE—Innu Kiewit Constructors: IKC-ONE—Innu Kiewit Constructors: H.J. O’Connell, Neilson, and EBC Inc. (rock and overburden excavation); Hatch (engineering services); Golder; EY (advising gov’t.); Aon (risk advisor) (risk/insurance advisor to authority); KPMG (advisory services); EXP (quality control work); CRT Construction (subcontractor for concrete installation); Morrison Hershfield (code); AGAT Labs (analytical testing); Deloitte
Financiers & Banks: TD Securities and Goldman Sachs (co-lead arrangers)
Other Suppliers: Lafarge and Holcim Canada (cement); GE (transformers, rotors, and stators); Mammoet; McKeil Marine; Canam Group
Legal: Cassels Brock & Blackwell (Government of Canada); Dentons (advisor to owner); Fasken Martineau DuMoulin (finance counsel to Nalcor); Gowling WLG (counsel to Emera); McCarthy Tétrault (TD Securities/Goldman Sachs); Borden Ladner Gervais (legal advisor)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley