Ruskin Dam and Powerhouse Upgrade
Province: British Columbia
City/Region: Mission
Image Credit: BC Hydro
NR
Project Rank
Project Type: Hydroelectric
Industry Sector: Energy
Project Amount: $748 million
Date of Completion: 2018
Funding Source: Public
Provincial Funding: BC Hydro: $748 million
Previous Rankings
| 2018 | 65 |
| 2017 | 62 |
| 2016 | 64 |
| 2015 | 64 |
| 2014 | 63 |
About The Project
The Ruskin Dam generation station has supplied power to the BC Hydro grid for almost 80 years and requires upgrades to ensure operational reliability and improve safety in the event of an earthquake. There are four major components to this project:
• The right bank of the dam is being reinforced with a specially designed cutoff wall, which will control and manage water seepage.
• Seven concrete piers and spillway gates will be removed and replaced with five new ones, and the one-lane road on top of the dam will be replaced with a twolane road.
• The powerhouse facility will be seismically upgraded and the powerhouse turbines, generators, and ancillary equipment will be upgraded or replaced (including upgrades to penstocks and intake tunnels that move water from the reservoir to the powerhouse).
• The switchyard, currently located on the roof of the powerhouse, will be rebuilt and relocated to the left bank behind the road.
The upgrades to the right bank are complete, and the replacement of the piers and spillway gates is underway. Approved by the British Columbia Utilities Commission in April 2012, construction began that year and the facility is expected to be in service in early 2018.
Engineer: BC Hydro; MWH Americas Inc.; Golder Associates (right abutment); Bogdonov Pao Associates
Contractor: Golder Construction (right abutment – Phase 2); FlatironDragados JV (upper dam and spillway gates, balance of plant)
Other Key Players: Hemmera (First Nation consultation and negotiation services); McElhanney (survey/geomatics services); Pomerleau
Architects: RATIO Architecture Interior Design + Planning Inc.
Turbine Supplier: Voith Hydro
Other Suppliers: HMI Construction (spillway gates), COH (powerhouse crane), Fortune Electric (generator step-up transformers), ABB (exciters), L&S Electric of Canada (governors)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley