Île d’Orléans Bridge
Province: Quebec
City/Region: Île d’Orléans
Image Credit: MTMD
31
Project Rank
Project End: 2031
Project Type: Bridge
Industry Sector: Transportation
Project Amount: $2.76 billion
Date of Completion: 2031
Funding Source: Public
Previous Rankings
2025 | 31 |
About The Project
The current bridge was put into service in 1935, and its replacement is essential to ensure the economic and tourist vitality of Île d’Orléans. The new crossing will provide a 3.5-metre-wide traffic lane in each direction and 2.5-metre-wide shoulders on each side of the deck. The deck also incorporates 3-metre-wide multipurpose paths in each direction, which allow access for maintenance vehicles. The new bridge is scheduled to be commissioned in 2028, while deconstruction work is expected to be completed in 2033. The project includes three components: the redevelopment of Côte du Pont and its intersection with Chemin Royal and Route Prévost (preparatory work); the construction of the new bridge, including the reconstruction of the interchange between the Dufferin-Montmorency highway, Sainte-Anne boulevard and the bridge; the deconstruction of the current bridge.
Project Owner: Ministère des Transports et de la Mobilité durable
P3 Team Members/Project Team: Groupe Héritage Île-d’Orléans S.E.N.C., a consortium including Dragados Canada Inc. and EBC Inc.
Other Key Players: TYLin, AtkinsRéalis (design and construction phase services); Stantec; EXP; Michel Virlogeux Consultant; Ramboll; CIMA+ (consulting engineer); GHD (geotechnical studies)
Architects: Lavigne Chéron Architectes
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley