Peel Region announces new overpass on Mississauga Road complete

Peel Region announced a key milestone in their upgrades to Mississauga Road, with a new bridge overpass that separates Mississauga Road from the CN Rail tracks and redirects traffic over the tracks.

This project, in partnership with CN Rail, serves to enhance connectivity and enable growth in the City of Brampton Heritage Heights secondary plan (for the northwest Brampton area) and southwest Caledon, while supporting the future rail service expansion of Metrolinx’s Kitchener line.

“The new Mississauga Road overpass is more than an infrastructure upgrade—it’s a vital connection that improves safety, reduces delays, and supports the future growth of Brampton and Caledon. This milestone demonstrates Peel Region’s commitment to building a transportation network that keeps people and goods moving efficiently, while preparing for tomorrow’s needs,”  said Kealy Dedman, Commissioner of Public Works, Peel Region.                  

Traffic on Mississauga Road will remain a single lane in both directions through summer 2026, when construction is scheduled to be completed.  

 (Region of Peel)

The widening and upgrades to Mississauga Road include:  

  • Expansion of Mississauga Road from two to six lanes between Bovaird Drive and Sandalwood Parkway. 
  • Widening of Sandalwood Parkway to Wanless Drive from two to four lanes. 

Additional features will include: 

  • A new multi-use pathway along the east side of Mississauga Road for pedestrians and cyclists. 
  • Upgraded streetlighting, landscaping, and boulevard improvements. 
  • Enhanced intersections and traffic signals for improved safety and efficiency. 

Featured image: (Region of Peel)

Leave a Reply

Your email address will not be published. Required fields are marked *

From major projects to policy shifts, get the essential news and analysis shaping the infrastructure sector — direct to your inbox weekly.