About The Project
In 2015, Bruce Power reached an agreement with the Independent Electricity System Operator (IESO) to advance a long-term investment program to extend the life of its nuclear feet and secure the site’s operation until 2064. The Life-Extension Program started on January 1, 2016, and began with the replacement of older systems during regularly scheduled maintenance outages. As part of the Life-Extension Program, Bruce Power is carrying out an intensive Major Component Replacement (MCR) Project, which began in January 2020 and focuses on the replacement of key reactor components in Units 3-8, including steam generators, pressure tubes, calandria tubes, and feeder tubes. The first of 6 MCR refurbishments was completed on September 8, 2023 when Unit 6 was synced back to the grid. The Unit 6 MCR project was finished ahead of schedule and under budget with over 12 million hours of construction work executed over the 3.5 year project. The second MCR refurbishment began on March 1, 2023 and Unit 4 will start in 2025 with all 6 refurbishments scheduled for completion by 2033. The life extension of each unit will add approximately 30 to 35 years of operational life, while other investments will add a combined 30 reactor years of operational life to the units.
Project Owner: Bruce Power
P3 Team Members/Project Team: DBFM Team: (Office Complex and Training Facility): Concert Infrastructure—Bird Construction, Stantec, Concert Realty Services—Stonebridge Financial Corp.
Engineer: Hatch (preliminary/planning study); Wood (WSP) (consulting engineer); Tetra Tech (MCR); Candu Energy (MCR)
Contractor: AECOM, Aecon, AREVA NP; Framatome (steam generator replacement); Black & McDonald (Unit 6 mechanical and electrical projects); Shoreline JV: Aecon, AECOM, AtkinsRéalis (Fuel Channel Feeder Replacement program); E.S. Fox, BWXT (Highland Nuclear); Steam Generator Replacement JV (Aecon, SGT (Framatome & United Engineers & Constructors Inc.)
Other Key Players: WSP (drafting support); Golder (WSP) (geotechnical services/environmental engineering); Deloitte; AGAT Labs (analytical testing); Burns & McDonnell (integrated project controls support); Sargent & Lundy (integrated project management & project controls support); Deloitte; CIMA+; Accenture (project manager); LRI Engineering
Other Suppliers: BWXT Canada Inc. (steam generators, feeder fabrication, end fittings, liners, and flow elements); Nu-Tech Precision Metals (zirconium alloy pressure tubes); Cameco Fuel Manufacturing (calandria tubes and annulus spacers); Brotech Precision (shield plugs); BC Instruments (Positioning assemblies, feeder hubs), Framatome (PHT chemical decontamination skid); Laker Energy Products (end fittings, liners, and flow elements); Victaulic; A.W. Hooker Associates Ltd. (cost consultant); Turner & Townsend (management consultant); ATS Industrial Automation Inc. (tooling performance); Velan Inc.; GE Vernova; Egis
Legal: Osler (lead counsel); Torys (acting for the lender); Dentons (legal advisor)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley