Champlain Bridge Deconstruction Project
Province: Quebec
Image Credit: JCCBI
NR
Project Rank
Project Start: 2020
Project End: 2024
Project Type: Bridge
Industry Sector: Transportation
Project Amount: $400 million
Date of Completion: 2024
Funding Source: Public
Federal Funding: $$400 million
Previous Rankings
2023 | 99 |
2022 | 99 |
2021 | 98 |
About The Project
The Champlain Bridge (also known as Pont Champlain) was a steel truss cantilever bridge with viaducts constructed of prestressed concrete beams. It crosses the Saint Lawrence River, connecting the Island of Montreal to its South Shore suburbs. Opened in 1962, the structure was degraded by de-icing salt. In 2015, construction began downstream on a replacement bridge designed to handle higher volumes of traffic. The replacement bridge opened on July 1, 2019, and the old Champlain Bridge was closed to traffic. The deconstruction project of the bridge will consist of three methods:
1. The deconstruction of the shoreline sections will be carried out from jetties set up along the river using standard equipment (excavators and cranes.)
2. Work from the river, which will be required for over 65 per cent of the project, will be done with a system of platforms attached to high-capacity lifting towers installed on a catamaran barge.
3. In January 2022, the main span located over the Seaway, the enormous 117.5-m long and 2,200-tonne component, was lowered 33 metres with strand jacks installed on anchor spans on each side, onto an assembly of two barges in the middle of the Seaway.
Project Owner: Jacques Cartier and Champlain Bridges Incorporated (JCCBI)
Project/Construction Manager: CCF (Consortium CIMA+, FNX Innov)
Engineer: PTA – Parsons, TeraTech, Wood-a WSP company (environmental); McElhanney (consulting)
Contractor: Nouvel Horizon St-Laurent GP: Pomerleau, Delsan A.I.M. Environmental Services Inc. • Engineer: American Bridge Company, SNC-Lavalin, T.Y.Lin International Group, Harbourside, ARUP • Design: Universal Structures Inc.
Environmental Services: GHD (geotechnical studies and engineer)
Other Key Players: Players: Aon (risk advisor); EY (mgmt. consultant); Arcadis-IBI Group (owner’s advisor); GHD (environmental)
Other Suppliers: Canam Group
Legal: Dentons
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley