Fort McMurray West Transmission Project
Province: Alberta
City/Region: Edmonton to Fort McMurray
Image Credit: Altus Group
NR
Project Rank
Project Type: Transmission
Industry Sector: Energy
Project Amount: $1.43 billion
Date of Completion: 2019
Funding Source: Private
Private Funding: $1.43 billion
Previous Rankings
2019 | 40 |
2018 | 35 |
2017 | 32 |
2016 | 33 |
2015 | 31 |
About The Project
This project will consist of approximately 500 kilometres of transmission line and associated facilities in order to support increasing growth in northeastern Alberta. It will include a 500-kilovolt (kV) AC single-circuit transmission line, approximately 100 kilometres in length, running from a new substation in the Thickwood Hills area to the existing Livock 939S substation, and a 500 kV AC singlecircuit transmission line, approximately 400 kilometres in length, running from Livock 939S substation to the approved Sunnybrook 510S substation.
The proposed route, substations, and design of the transmission line are subject to approval by the Alberta Utilities Commission (AUC). Approval for the project was granted by the AUC in February 2017. The project is set to be in service in 2019.
Project Owner: Alberta PowerLine
Engineer: Alberta PowerLine—Quanta Services (subsidiary Valard Construction to provide EPC services), ATCO Electric (route planning, operations, and maintenance)
Other Key Players: Aon Risk Solutions (risk/insurance advisor to authority); INTECH Risk Management (insurance advisor)
Legal: Bennett Jones (acted for successful proponent); Norton Rose Fulbright; Torys (proponent lenders); Fasken Martineau DuMoulin (counsel to Quanta Services and Valard Construction)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley