Île d’Orléans Bridge

Province: Quebec

City/Region: Île d’Orléans

Image Credit: MTMD

36

Project Rank

Project End: 2028

Project Type: Bridge

Industry Sector: Transportation

Project Amount: $2.76 billion

Date of Completion: 2028

Funding Source: Public

LEED Status: Certified

Previous Rankings

202531
202636

About The Project

The new crossing will provide a 3.5-metre-wide traffic lane in each direction and 2.5-metre-wide shoulders on each side of the deck. The deck also incorporates three-metre-wide multipurpose paths in each direction, which allow access for maintenance vehicles. The new bridge is scheduled to be commissioned in 2028, while deconstruction work is expected to be completed in 2033. The project includes three components: the redevelopment of Côte du Pont and its intersection with Chemin Royal and Route Prévost (preparatory work); the construction of the new bridge, including the reconstruction of the interchange between the Dufferin-Montmorency highway, Sainte-Anne boulevard and the bridge; the deconstruction of the current bridge.

Project Owner: Ministère des Transports et de la Mobilité durable

P3 Team Members/Project Team: Groupe Héritage Île-d’Orléans S.E.N.C., a consortium including Dragados Canada Inc. and EBC Inc.

Other Key Players: TYLin, AtkinsRéalis (design and construction phase services); Stantec; EXP; Michel Virlogeux Consultant; Ramboll; CIMA+ (consulting engineer); GHD (geotechnical studies); Arup (technical advisor)

Architects: Lavigne Chéron Architectes

Legal: Gowling WLG