John Hart Generating Station Replacement Project
Province: British Columbia
City/Region: Campbell River
Image Credit: BC Hydro
NR
Project Rank
Project Type: Hydroelectric
Industry Sector: Energy
Project Amount: $1.093 billion
Date of Completion: 2018
Funding Source: P3
Provincial Funding: $1.093 billion
Previous Rankings
| 2018 | 51 |
| 2017 | 45 |
| 2016 | 46 |
| 2015 | 47 |
| 2014 | 47 |
About The Project
This generating station project includes the replacement of three 1.8-kilometre penstocks with a 2.1-kilometre tunnel through bedrock (completed in Sept. 2016); construction of a replacement generation station upstream of the existing station; replacement of the water intake at the John Hart Spillway Dam; and the construction of a new water bypass facility within the new generating station. The current station has been providing energy to the B.C. grid for more than 67 years, and this project aims to improve safety features to protect it against seismic activity, continue to provide reliable hydroelectric power, and protect downstream fish habitat from water flow disruptions.
First Nations have signed project impact benefit agreements with BC Hydro. In February 2014, BC Hydro announced that InPower BC was awarded the contract to design and build the project, the cost of which remains well within the range initially submitted to the British Columbia Utilities Commission. Construction began in summer 2014 and is expected to be completed by late 2018.
Project Owner: BC Hydro
P3 Team Members/Project Team: InPower BC General Partnership—SNC-Lavalin; Aecon
Environmental Services: Hatfield; SNC-Lavalin
Other Key Players: BTY Group (cost consultant); Ernst & Young (advising gov’t); Frontier-Kemper; GE Energy (formerly Alstom); Golder Associates; Mott MacDonald (lenders’ technical advisor); INTECH (insurance advisor); KPMG (commercial advice and due diligence); McElhanney; Hemmera; Golder Associates (owner’s engineer team); Altus Group; ZINC Strategies
Financiers & Banks: SNC-Lavalin Capital Inc.; Scotiabank Global Banking and Markets (underwriter); National Bank Financial (colead underwriter)
Legal: Borden Ladner Gervais (counsel to BC Hydro); Blake, Cassels & Graydon (SNCLavalin Capital Inc.); McMillan (underwriters and construction lender)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley