Keeyask Hydroelectric Project
Province: Manitoba
City/Region: Lower Nelson River
Image Credit: Manitoba Hydro
NR
Project Rank
Project Type: Hydroelectric
Industry Sector: Energy
Project Amount: $8.7 billion
Date of Completion: 2021
Funding Source: Public
Provincial Funding: Provincial/First Nations Keeyask HydropowerLimited Partnership (co-owned by Manitoba Hydroand Keeyask Cree Nations): $8.7 billion
MW Generation Power: 695
Previous Rankings
| 2021 | 9 |
| 2020 | 8 |
| 2019 | 6 |
| 2018 | 6 |
| 2017 | 7 |
| 2016 | 5 |
| 2015 | 4 |
| 2014 | 3 |
About The Project
This 695-megawatt hydroelectric generating station will be a source of renewable energy, producing an average of 4,400 gigawatt-hours of electricity each year. The scope of work includes rock excavation, concrete for the powerhouse and spillway, earthen structures, electrical and mechanical work, and the construction and removal of temporary cofferdams needed to manage the river flow during construction.
Energy produced will be integrated into Manitoba Hydro’s electric system for use in Manitoba and for export. Keeyask will be Manitoba’s fourth-largest generating station. The design for the project agreement is based on a partnership model between Manitoba Hydro and the four Keeyask Cree Nations, including the Tataskweyak Cree Nation, War Lake First Nation, Fox Lake Cree Nation, and York Factory First Nation.
A work disruption and subsequent road blockade, both due to the pandemic, delayed some construction works on the project in the spring. However, with its first generators still having come online in fall 2020, there were no significant project delays expected.
Project Owner: Keeyask Hydropower Limited Partnership
Project/Construction Manager: Manitoba Hydro (acting as project manager and will operate plant on behalf of KHLP once completed); Tetra Tech (construction management support)
Engineer: SNC-Lavalin; Hatch (engineer); KGS Group; AECOM; Wood (consulting)
Contractor: BBE Hydro Constructors Ltd.: Bechtel, Barnard, and EllisDon
Environmental Services: Arcadis Canada Inc.
Other Key Players: Aon (risk/insurance advisor to authority); Golder (info mgmt. solution services); Hanscomb (owner’s cost consultant and special advisor); Boston Consulting Group (capital project analysis); Englobe (quality assurance inspection services); WSP (construction surveying); Dillon Consulting (engineering and environmental services)
Other Suppliers: Voith Hydro
Legal: Fasken Martineau DuMoulin (advised Manitoba Hydro); Borden Ladner Gervais (legal advisor)
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Gold (15-19 Projects)
Silver (10-14 Projects)
Bronze (5-9 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- Alstom
- Associated Engineering
- Black & McDonald
- Blake, Cassels & Graydon
- Cartel Communication Systems
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- DIALOG
- EBC Inc.
- FlatironDragados
- GeoVerra
- HDR
- Hemmera
- Infrata
- Kasian
- Lakeland Consulting Inc.
- Lavery, de Billy
- LRI Engineering
- McMillan LLP
- Montrose Environmental
- Mott MacDonald
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Parkin Architects Ltd.
- Plenary Americas
- R.V. Anderson
- STRABAG Inc.
- Tiree
- Torys