Pattullo Bridge Replacement Project

Province: British Columbia

City/Region: New Westminster

Image Credit: BC Ministry of Transportation and Transit

56

Project Rank

Project End: 2026

Project Type: Bridge

Industry Sector: Transportation

Project Amount: $1.64 billion

Date of Completion: 2026

Funding Source: Public

Provincial Funding: $1.64 billion

LEED Status: Certified

Previous Rankings

202562
202457
202352
202253
202145
202044
201944
202656

About The Project

The new four lane crossing is being built to modern safety standards and features wider lanes to better accommodate passenger and commercial vehicles, a centre median barrier, dedicated multi-use pathways for walking and cycling that are separated from traffic on both sides of the bridge and is designed to accommodate potential future expansion to six lanes. The new bridge will be located just upstream and northeast of the existing bridge and will include new on and off ramps to connect the new bridge with the existing road network.

Project Owner: Province of British Columbia (The Transportation Investment Corporation is leading the delivery of the project on behalf of the Ministry of Transportation and Transit)

Project/Construction Manager: TI Corp., Charter PDI, WSP, R.F. Binnie, Northwest Hydraulic Consultants, Tetra Tech, TYLin, Archer CRM (Owner's Team)

P3 Team Members/Project Team: DBF Team: Fraser Crossing Partners Engineer: Parsons (Owner’s Engineer); Hatch; Tetra Tech (environmental); WSP (owner’s engineer/technical advisor/field services); COWI; Design-Build Contractor: Fraser Crossing Constructors General Partnership—Acciona Infrastructure Canada Inc. and Aecon Constructors; Contractor's Design Team: Leonhardt, Andrä and Partner (LAP), EXP, Thurber Engineering, TWD Technologies Ltd., VIA Architecture, Hatch

Other Key Players: AECOM; Golder (WSP) (geotechnical studies); Stantec (engineering services); Wood (WSP) (materials tester); Deloitte (commercial advisor); Hemmera; Hanscomb (cost consultant); McElhanney (site surveyor), G. Ho Engineering Consultants (road safety audits); Entuitive; GeoVerra (quality control); Kontur (materials testing); INTECH, Marsh Canada (risk advisor); KPMG; ULMA Construction; Bird Construction (Fraser River Pile and Dredge-subsidiary); Turner & Townsend (cost consultant)

Legal: Borden Ladner Gervais; McMillan LLP (for the lender)