The Waneta Expansion

Province: British Columbia

City/Region: South of Trail

NR

Project Rank

Project End: 2015

Project Type: Hydroelectric

Industry Sector: Energy

Project Amount: $900 million

Funding Source: Private

Private Funding: Fortis: $459 million CPC/CBT: $441 million

Previous Rankings

201555
201448

About The Project

This expansion project involves the addition of a second powerhouse downstream from the Waneta Dam on the Pend d’Oreille River, producing 335 MW. A new 10-km transmission line has been constructed to deliver a stepped-up output of 230 kV from the powerhouse to BC Hydro’s Selkirk Substation. The energy will be sold to BC Hydro under
a long-term energy purchase agreement.

Recently, construction has included completion of work on the runner, stator, and rotor for one unit, the installation of the gates, stoplogs, and sturgeon exclusion screens in the powerhouse, as well as blasting in the tailrace area and structural concrete work in the intake area. Completion of electrical and mechanical work, rotor and stator assembly for the remaining unit, and further preparations in the intake area continue.

Construction started in 2010 and completion is expected in 2015.

Project Owner: Fortis, Columbia Power Corp., and the Columbia Basin Trust

Engineer: Golder Associates (environmental consulting engineers); Hatfield Consultants; Hatch

Contractor: SNC-Lavalin (EPC contractor); Aecon (civil design, construction)

Financiers & Banks: CIBC World Markets (advisor to Columbia Power and Columbia Basin Trust)

Turbine Supplier: Voith Hydro

Legal: Fasken Martineau DuMoulin LLP (advising Waneta Expansion Limited Partnership)

Key Players

Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.