Waasigan Transmission Line

Province: Ontario

City/Region: Dryden

Image Credit: Hydro One

70

Project Rank

Project End: 2027

Project Type: Transmission

Industry Sector: Energy

Project Amount: $1.2 billion

Date of Completion: 2027

Funding Source: Public

LEED Status: Certified

Previous Rankings

202568
202670

About The Project

The Waasigan Transmission Line, built in partnership with nine First Nations, will be a new double-circuit 230 kilovolt transmission line between Lakehead Transformer Station (TS) in Shuniah and Mackenzie TS in the Town of Atikokan, and a new single-circuit 230 kilovolt transmission line between Mackenzie TS and Dryden TS in the City of Dryden. Construction began in 2024 with the first phase from Shuniah to Atikokan in-service at the end of 2025 and the second phase from Atikokan to Dryden in-service by the end of 2027.

Project Owner: Hydro One Inc.

Project/Construction Manager: Engineering, Procurement and Construction Partner: Valard Construction LP

Other Key Players: Chi Mino Ozhitoowin (subcontracted to Valard); Dillon Consulting; TULLOCH (environmental services); Apache Powerline Consulting; AtkinsRealis; Burns & McDonnell; WSP