Region of Waterloo ION LRT – Stage 1
Province: Ontario
City/Region: Waterloo, Kitchener, and Cambridge, Ontario
Image Credit: Region of Waterloo
NR
Project Rank
Project Type: LRT
Industry Sector: Transit
Project Amount: $818 million
Date of Completion: 2018
Funding Source: P3
Federal Funding: $Building Canada Fund: $265 million
Provincial Funding: $300 million
Municipal Funding: $253 million
Previous Rankings
| 2018 | 60 |
| 2017 | 59 |
| 2016 | 59 |
| 2015 | 59 |
| 2014 | 53 |
About The Project
Transit options for the Region of Waterloo were debated at length before light-rail technology was selected instead of bus rapid transit. LRT offers the best long-term value for expanding the local public transit system. The region chose to use Bombardier as the supplier for the LRT vehicles based on an existing agreement Metrolinx had already approved. This agreement will allow the region to capitalize on a larger volume purchase, potentially reducing the individual cost of the vehicles, as well as the cost of spare parts and maintenance contracts.
This rapid transit service will shape the future of the community’s transportation system by bringing LRT in two stages. Stage 1 was expected to open in 2017, but was delayed to 2018 by issues regarding vehicle delivery and functionality. Stage 1 of the line includes a 19-kilometre LRT route from Conestoga Mall Transit Terminal to Fairview Park Mall Transit Terminal, with stops in downtown Kitchener, Grand River Hospital, UpTown Waterloo, both universities, and Waterloo Park. It also features a 17-kilometre route of adapted bus rapid transit (aBRT) from Fairview Park Mall to the Ainslie Street Terminal in Cambridge, with four stops along Hespeler Road. Stage 2 will see the BRT line converted to LRT, creating a seamless 37-kilometre service of 23 stops between Cambridge and Waterloo. Phase one was originally to open in late 2017, issues with the light rail vehicles to be used on the project has caused completion to be moved to spring or summer of 2018.
Project Owner: Region of Waterloo
Engineer: WSP (owner’s engineer: includes technical advisor, program manager and owner’s engineer role, phase one ESA)
Contractor: DBFMO Team: GrandLinq, including Plenary, Meridiam, Aecon, Kiewit and Keolis
Environmental Services: Golder Associates (environmental consulting engineers); Hatfield Consultants; Hatch (EA)
Other Key Players: AECOM (project assessment process team); Aon (owner advisor and construction insurance broker); BTY Group (lenders’ technical advisor); Golder Associates (construction); Infrastructure Ontario (procurement advisor); Hanscomb (EA engineer’s cost consultant); INTECH (insurance advisor); LeighFisher (lenders’ technical advisor); Englobe (geotechnical services, pavement design & quality assurance); Aon Risk Solutions
Financiers & Banks: CIBC World Markets (underwriter and bookrunner to GrandLinq)
Architects: PBK Architects (station stop design)
Vehicle Supplier: Bombardier
Other Suppliers: Siemens
Legal: Blake, Cassels & Graydon (counsel to successful proponent); Fasken Martineau DuMoulin (advised lenders); Gowling WLG (counsel to Grandlinq); Norton Rose Fulbright (acted for Waterloo); Osler
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley