Project Type: Natural Gas
Industry Sector: Energy
Project Amount: $1 billion
Date of Completion: 2022
Funding Source: Private
Private Funding: $1 billion
Previous Rankings
| 2018 | 54 |
| 2017 | 48 |
| 2016 | 50 |
| 2015 | 33 |
| 2014 | 27 |
About The Project
The goals of this initiative are to increase baseload electrical generating capacity in Alberta in an era when conventional coal-fired generation is being phased out and provide long-term economic benefits to the local and regional area. In June 2014, the Alberta Utilities Commission (AUC) approved MAXIM’s application to construct and operate a 520-MW natural gas-fired expansion (M2) at the site of the existing 150-MW Milner generating facility (M1).
The expansion will be located adjacent to M1 and will take advantage of the existing infrastructure at the site, allowing MAXIM to leverage benefits including electrical connection, fuel delivery, water licenses, and a skilled operations team. Natural gas will be supplied via an expansion of the existing natural gas pipeline that currently supplies M1. In February 2015, the AUC approved MAXIM’s application for an 86-MW expansion (M3) to M1; the expansion will be composed of two natural gas-fired turbines located next to M1. Exhaust energy from these turbines will be converted to steam and utilized to generate electricity in the existing M1 steam turbine, displacing coal-sourced steam. These two initiatives will increase the capacity at the Milner site from 150 MW to 756 MW.
Construction timing for both projects is pending clarity on new Alberta provincial climate change initiatives and regulations. It is also anticipated that M3 would be completed in advance of M2.
Project Owner: Maxim Power Corp.
Contractor: Covanta Energy Corporation
Key Players
Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.
Platinum (20+ Projects)
- Accenture
- AECOM
- Aecon
- AGAT Labs
- Aon
- Arcadis IBI Group
- CIMA+
- Deloitte
- Dentons
- Dillon Consulting
- E.S. Fox
- Egis
- EllisDon
- Englobe
- Entuitive
- EXP
- EY
- GHD
- Golder (WSP)
- Hanscomb
- Hatch
- HKA
- Infrastructure Ontario
- INTECH Risk Management
- Jacobs
- KPMG
- LEA Group
- McElhanney
- Norton Rose Fulbright
- Parsons
- PCL
- Stantec
- Tetra Tech
- TULLOCH
- Victaulic
- Wood (WSP)
- WSP
Silver (10-14 Projects)
- ACCIONA Infrastructure Canada
- Accuracy
- ACS Infrastructure
- Associated Engineering
- Bennett Jones LLP
- Bird Construction
- Blake, Cassels & Graydon
- COWI
- Davies Ward Phillips & Vineberg
- DECAST Ltd.
- HDR
- Hemmera
- Infrata
- Kasian
- LRI Engineering
- Matrix Solutions
- McMillan LLP
- Montrose Environmental
- Mulvey & Banani
- NORR Architects & Engineers Ltd.
- Osler
- Rider Levett Bucknall
- Sener SES Canada Inc.
- Singleton Urquhart Reynolds Vogel
- Tiree
- Torys
Bronze (5-9 Projects)
- Allnorth
- Amico
- Andritz Hydro Canada
- Arium Design
- Astaldi
- Bessac
- Bombardier
- Caisse Centrale Desjardins
- Cameco
- Cannon Design
- CRH Canada
- Crossey Engineering Ltd.
- Daoust Lestage
- Dexter Quebec
- Dr. Sauer & Partners
- Entro
- Flatiron
- International Bridge Technologies
- Johnson Controls
- KGS Group
- Laker Energy
- LeighFisher
- Milestone Environmental
- Modern Niagara Toronto Inc.
- Montgomery Sisam Architects Inc.
- Nu-Tech Precision Metals
- Plenary Americas
- PwC
- RBC Dominion Securities Inc.
- Siemens
- Space2Place
- STRABAG Inc.
- Turner Construction Company
- Valard
- WestPro
- Worley